Two years of acquiring data from the pier next to the South Carolina Aquarium.
August 23, 2003
October 12, 2003
November 16, 2003
December 14, 2003: Starting the west deck
Jan 18, 2004: Starting the east deck
February 22, 2004:
March 7, 2004: 1st cable pulled
April 18, 2004:
May 9, 2004: 2nd cable pulled
June 7, 2004
July 4, 2004
Hurricane cables attached on the approach side of the west span
August 7, 2004:
Hurricane cables on the east span
September 1, 2004:
September 12, 2004:
You can see the recently added 2nd set of hurricane cables at the left edge of the west backspan
September 19, 2004:
You can see the recently added 2nd set of hurricane cables at the right edge of the east backspan
September 24, 2004:
10th cable sets pulled
October 15, 2004:
November 14, 2004:
November 28, 2004:
Note the shark-fin edge girders resting on the barge in the foreground
December 1, 2004
Building the 14th cable bundle(west backspan)
and erecting the 14th edge girder (west main span)

Where are the west-most hurricane cables? It seems that this set was temporary - to minimize lateral movement of the west deck until it could be connected to the west approach. Now that the approach has been attached to the back span, I suppose that these cables are no longer necessary. In addition, the counterweights are being removed since a balancing act is no longer required (thanks to David Wertz, SCDOT).
5pm: Erecting the 14th edge girder (if I counted correctly)

10 minutes later

A close look at the girder

I am often surprised by what is available to be seen by that I do not see. I was so focused on capturing the new cables and their curved stay-cable pipes that I completely missed the fact that the west-most hurricane cables are now absent. I only discovered this change when I was annotating this photo.
December 18, 2004: Bridging the Channel Gap


Avoiding traffic on the Pearman bridge has its advantages. Each Sunday morning, I start my bicycle trip across the bridge in order to avoid traffic and get a few close photos of what is happening. The timing often coincides with early sunrise and the views are simply spectacular.


January 8, 2005: Bridging the Channel Gap
Big progress this
week. On the west platform the LAST (16th) edge girders are in place
(if I counted correctly), while on the east platform, the cable bundles
have been built and floor girders erected and attached to the edge
girders that were in place last week.
Here are views of the "gap" from the old bridge - looking east
Looking west (click on the photo and look for the two anchored barges with the last two pairs of edge girders and associated floor girders)

January 22, 2005:Bridging the Channel Gap
Note the 15th cables completed on the east side
January 23, 2005 morning
Almost complete - 1 more anchor edge girder and then the 10 foot center edge girder to join the east and west platforms

A view of the gap from the old bridge. At -1 C, there is little haze and the Charleston harbor looks very picturesque this morning.

March 6, 2005:
The Channel Gap < 6 inches and a view from the Pearman bridge

To help your imagination, here is a view of the last gap as seen from the Pearman bridge. Note the fairing installed along the edge girders on the west side. Soon similar wind breakers will be installed on the east side. You can see pairs of attachment points on the vertical stiffeners on the east edge girders.

March 26, 2005: Bridging the Channel Gap
Look dad, the west tower crane disappeared
April 14, 2005: Bridging the Channel Gap
The East Tower Crane is gone - except a segment of the jib, sleeping on the deck
May 27, 2005:
No tower cranes, no central gap and no errors.
The gapless center span