Summary of the Main Span Construction Sequence:
Two years of acquiring data from the pier next to the South Carolina Aquarium.

August 23, 2003

Photo not archived

October 12, 2003

November 16, 2003

Photo not archived

December 14, 2003: Starting the west deck

Jan 18, 2004: Starting the east deck

Photo not archived

February 22, 2004:

Photo not archived

March 7, 2004: 1st cable pulled

April 18, 2004:

Photo not archived

May 9, 2004: 2nd cable pulled

Photo not archived

June 7, 2004

Photo not archived

July 4, 2004
Hurricane cables attached on the approach side of the west span

Photo not archived

August 7, 2004:
Hurricane cables on the east span

Photo not archived

September 1, 2004:

Photo not archived

September 12, 2004:

You can see the recently added 2nd set of hurricane cables at the left edge of the west backspan

Photo not archived

September 19, 2004:

You can see the recently added 2nd set of hurricane cables at the right edge of the east backspan

Photo not archived

September 24, 2004:

10th cable sets pulled

Photo not archived

October 15, 2004:

Photo not archived
Photo not archived

November 14, 2004:

Photo not archived
Photo not archived

November 28, 2004:

Photo not archived

Note the shark-fin edge girders resting on the barge in the foreground

Photo not archived

December 1, 2004
Building the 14th cable bundle(west backspan) and erecting the 14th edge girder (west main span)

Photo not archived
Yesterday Christopher and I were doing our usual James Island Connector noon run. Running along the connector toward MUSC we often look for any changes to the new Cooper River Bridge. Usually there is little change to see (we are probably 2 miles from the bridge), but yesterday was a surprise - you could identify new cable bundles being built from the curvature of newly erected stay-cable pipes - the 14th on the west side. So this morning (7am) I raced to the Aquarium to take a few photos and hoping that the workers had not completed the tensioning during the night. I was not disappointed. Here you can see the white stay-cable pipes with curvature, with the internal cables not fully tensioned. I returned about 5pm to make a few more photos and discovered that they were erecting the 14th edge girder on the channel side of the west platform. 7am

Where are the west-most hurricane cables? It seems that this set was temporary - to minimize lateral movement of the west deck until it could be connected to the west approach. Now that the approach has been attached to the back span, I suppose that these cables are no longer necessary. In addition, the counterweights are being removed since a balancing act is no longer required (thanks to David Wertz, SCDOT).

5pm: Erecting the 14th edge girder (if I counted correctly)

10 minutes later

A close look at the girder

I am often surprised by what is available to be seen by that I do not see. I was so focused on capturing the new cables and their curved stay-cable pipes that I completely missed the fact that the west-most hurricane cables are now absent. I only discovered this change when I was annotating this photo.

December 18, 2004: Bridging the Channel Gap

Avoiding traffic on the Pearman bridge has its advantages. Each Sunday morning, I start my bicycle trip across the bridge in order to avoid traffic and get a few close photos of what is happening. The timing often coincides with early sunrise and the views are simply spectacular.

January 8, 2005: Bridging the Channel Gap
Big progress this week. On the west platform the LAST (16th) edge girders are in place (if I counted correctly), while on the east platform, the cable bundles have been built and floor girders erected and attached to the edge girders that were in place last week.

Photo not archived

Here are views of the "gap" from the old bridge - looking east

Photo not archived

Looking west (click on the photo and look for the two anchored barges with the last two pairs of edge girders and associated floor girders)

January 22, 2005:Bridging the Channel Gap

Note the 15th cables completed on the east side

January 23, 2005 morning

Almost complete - 1 more anchor edge girder and then the 10 foot center edge girder to join the east and west platforms

A view of the gap from the old bridge. At -1 C, there is little haze and the Charleston harbor looks very picturesque this morning.

March 6, 2005:
The Channel Gap < 6 inches and a view from the Pearman bridge

Photo not archived

To help your imagination, here is a view of the last gap as seen from the Pearman bridge. Note the fairing installed along the edge girders on the west side. Soon similar wind breakers will be installed on the east side. You can see pairs of attachment points on the vertical stiffeners on the east edge girders.

March 26, 2005: Bridging the Channel Gap
Look dad, the west tower crane disappeared

Photo not archived
Photo not archived

April 14, 2005: Bridging the Channel Gap

The East Tower Crane is gone - except a segment of the jib, sleeping on the deck

Photo not archived

May 27, 2005:
No tower cranes, no central gap and no errors.

Photo not archived

The gapless center span

Photo not archived