June 9 2005: Opening Dates Announced

Patiently waiting is not one of my virtues but I have learned that waiting impatiently takes just as long. Here is the best information I have, following an announcement from SCDOT today (June 9, 2005):
July 9 Saturday afternoon Bridge Open for pedestrian strolling
July 10 Sunday afternoon Bridge Open for pedestrian strolling
July 11 Monday evening Fundraising event
July 14 Thursday evening Fireworks then stay-cable lighting
July 16 Saturday 9am Bridge Dedication and formal opening
Other event times are a bit uncertain, but I shall post them as soon as I find out
posted at: 10:00