April 23, 2005:Joining the East Bay ramp with the Meeting Street Ramp

Paving of the roadway and bike path is almost complete


From the Meeting Street on ramp:
Completing the expansion joint and
paving the bike / pedestrian path

A view of the East Bay on ramp from the Pearman Bridge
