This web page started very innocently. I took a photo when my grandchildren were visiting in August 2003 - from the Aquarium. About a month later, I noted that there was visible progress with the bridge - so I returned to the aquarium to take a photo from the same location. It was closed (7am Sunday morning) - so I went next door. The photos changed from an innocent event to a web site where my grandchildren could watch the progress from their homes in Minneapolis (now Nashville) and Louisville. Some others have encouraged me to continue - so here are the weekly (mostly) updates. Click to send me comments
The Birth of a new bridge:Most of the following photos were taken from the far right of the small pier attached to the shopping area adjacent to the Aquarium. Early each Sunday morning (usually) there is a clear view of the bridge from this point. A few of the early morning photos below were taken from I26 near the construction - shooting back into the sun as it rises over Sullivan's island. I use a Nikon 5700 (5 Mpixel) using plain jane point and shoot fully automatic mode. I use The GIMP for post processing of the images. I remove the top and bottom third to give the appearance of a panoramic view, and use unsharp mask (radius - 5.0, amount = 0.50 and threshold = 0) to bring out the edges. The rest is up to the sun (early morning or late afternoon) - and the Charleston Tour Boat. I have a small competition with the Tour Boat - as recently (Feb 2004) they have grabbed my camera spot for boat repairs or wedding parties. However, after some discussion, they have gratiously allowed me to quickly make the photos in order to continue this sequence. Walking back from the pier, I pass the Pride, and sometimes take a photo of the bridge framed by the jib sail rigging.
February 22, 2004: A view across the bow of The Pride of Charleston
Watch the bridge grow:
August 23, 2003
The first photo taken from the SC Aquarium. Almost in the beginning of growing the main pylons

Oct 12, 2003
Oct 19, 2003
Oct 26, 2003
Construction Progress - Nov 2, 2003
Construction Progress - Nov 9, 2003
Construction Progress - Nov 16, 2003

Construction Progress - Nov 23, 2003

Construction Progress - Nov 30, 2003
Construction Progress - Dec 07, 2003
Construction Progress - Dec 14, 2003 (raining)
Construction Progress - Jan 13, 2004 (early morning)
(Sorry for the lapse - just back from a wonderful holiday in Thailand)
Jan 18, 2004
Jan 25, 2004 - (cold, windy and dark)
Jan 31, 2004 - (windy, taken from the Aquarium )
Feb 15, 2004 - (drizzle, gloomy and basically awful)

Feb 22, 2004 - (clear, crisp and sunny - 7:30am)

Feb 28, 2004 - (clear, cold and sunny - 7:15am)

March 7, 2004:
First cable pulled on the west
platform

Mar 14, 2004 - (clear, cloudy - 6:55am)
Stay cables assembled for the west platform

Mar 21, 2004 - (hazy - 6:55am)

Apr 18, 2004
Sorry for the missing past week's photos. I was in Chennai (Madras), India at the Indian Institute of Technology and the Volunteer Health Services Hospital (Adyar).
Morning (about 7am)
Afternoon (about 6pm)
Apr 26, 2004:
All 1st anchor cables in place
on west and east decks
May 02, 2004
Note 2nd set of cables anchored on the west pylon and extension beams including the 2nd set of anchors added to the east pylon platform
6pm
May 09, 2004
7am| West Pylon | East Pylon |
| West Pylon | East Pylon |


The morning light is no longer suitable for continuing the series with morning photos. I shall continue with late afternoon photos.
(click and see the addition of a new cable on the left)
concrete forms removed from pylon apex and 4th set of anchors added to the westward platform on the west pylon
(Note 4th set of anchors added to the west side of the platform)
(Note 3rd set of anchors added to the west side of the platform)
June 13, 2004 - Guess what - from Cessenon France
Each Sunday I have a ritual of photographing the construction of the new Cooper River Bridge. Just now, we are with Rachel, Trevor and Max, our 1 yeqr old grand son. Each day we drive from Cazedarnes to Cessenon to buy the breakfast: pain aux raisin, pain aux chocolat and baguettes. There is a small suspension bridge crossing the river Orb - and I could not resist.
Near Millau is a very interesting cable stay bridge. We were unable to visit but here is a link to the Millau project
Each time I visit my photo spot, I assume that nothing interesting is going to happen. But usually, something interesting does happen. This time, as I was leaving, I noticed that they were placing the structural steel members between the 2nd and 3rd pylons on the left (where you see a crane neck poking up). So I took a sequence of photos which are on the enginnering details page.
Note the extension beams with attached anchors on the westward extension of the platform ready to receive the cross members (white beams on the barge anchored to the left of the base of the west pylon). Also note the two stacks of cement blocks (I think its ballast to balance the weight of the westward directed platform) on the eastward directed platform. Click to see a view of the ballast from the old bridge
The cross beam can be clearly seen here, in preparation for adding the next set of cable anchors and platform extension beams. Each extension beam has an attached anchor prior (see barge photo). The gray squares along the length of the platform are the splices between extension segments.
5:30 pm 6th cables set on the west pylon, 6th anchors extendion completed on the east pylon
This week, there are 7 cables on the ship channel side of each tower and 6 cables on the approach side of each tower (click the gap photos and count them if you have curious eyes )
August 7, 2004 - A beautiful sunset and 8th anchor extension (west), building 7th cable bundle (east)
Extending the channel segment, 8th anchor (see right side)
Building the east cable bundles, 7th anchor (see right side)
August 14, 2004 - After Charley: 8th anchor cable pulled (west), building 7th cable bundle (east)
8th cable pulled (see right side) Note also that the booms of the two platform crans has been dropped to the platform, I suppose in preparation for high winds from Charley
Extension to 8th anchor (see left side)
August 21, 2004
Platform extended over the channel, 9th anchor added
August 29, 2004
No early morning bike ride today - maybe later, if Gaston behaves. Frances is in the lower right - next week's challenge.
9th anchor extended to the west and 9th cable bundle completed on the channel side. Note Hurricane cable anchors under the left end of the deck
8th cable bundled completed on the channel side.
August 29, 2004 7pm: Guess what? We have a bit of sun BUT, over the past few hours, Hermine has suddenly appeared.
September 1, 2004
September 5, 2004
Obviously I am not in Charleston, but in Manzanilla, Mexico. So here is the bridge to the small village where we stayed. A week of snorkeling at La Boquita, underwater photos, a visit to friends at the University of Colima and a visit to Guanajuato.
Early Morning View of the Bridge
Afternoon View of the Bridge
September 12, 2004:
10th added Anchor to the west platform, 2nd set of hurricane cables added to the west platform. (Try to catch the light on a very cloudy day! Otherwise, its impossible to see the cables.)
September 19, 2004: West Approach Pier Completed
Jeanne is coming!
September 26, 2004: Another View from Mt. Pleasant
October 3, 2004: building 11th Cable bundles (west pylon, channel side)
October 9, 2004:
Completing 11th Cable bundles (west pylon, approach side) - only 2 anchors to complete the approach side of the deck
October 17, 2004:
I got lucky - between Friday and this morning,
the 12th anchors have been added to the west approach side
October 31, 2004:
November 14, 2004
Splicing the west approach and west deck: Completed.
November 21, 2004
Building the 13th cable bundle on the channel side(west platform)
November 28, 2004
December 1, 2004
Building the 14th cable bundle(west approach)
and erecting the 14th edge girder (west channel side)

Where are the west-most hurricane cables? It seems that this set was temporary - to minimize lateral movement of the west deck until it could be connected to the west approach. Now that the approach has been attached these cables are no longer necessary. In addition, the counterweights are being removed since a balancing act is no longer required (thanks to David Wertz, SCDOT).
5pm: Erecting the 14th edge girder (if I counted correctly)

10 minutes later

A close look at the girder

I am often surprised by what I do not see. I was so focused on capturing the new cables and their curved sheaths that I completely missed the fact that the west-most hurricane cables are now absent. I only discovered this change when I was annotating this photo. Check out the photo below and you will see the west hurricane cables in place. Hmmm - wonder what this is all about?
December 5, 2004: Panarama
Building the 14th cable bundle (west, channel side)
, disassembly of the west approach crane, preparing to build the 13th cable
bundle (east, approach side) and removing the hurricane cables (compare the
east (right) with the west (left).
December 12, 2004
Building the 15th cable bundle on the west
approach and adding the 13th anchor segment to the east channel deck.
December 16 evening: A chance photo of the east tower.
and the bridge

December 18, 2004: 13th cable built on the channel side of the east deck
December 23, 2004
Otherwise, a dark and gloomy morning
Where I take the weekly photos - you can see the Aquarium to the left
From this spot, this is what I see looking north
January 2, 2005
Here is the bridge update. When I returned from Florida, I see that PBC has added the 14th set of edge girders to the east platform - nearing the end. My dream is to be up close and personal on the day that they erect the final pair of edge girders from each side. Thus far, I have been extremely lucky - with the help of SCDOT and PBC of course!
January 8, 2005
Lots of progress closing the channel gap.
The west platform as been extended by the last edge girder while the
east platform extension (from last week) has been completed: floor
girders in place and the cable bundle built.
January 15, 2005
Last cable bundle on the west platform,
channel side finished. 15th cable bundle on the east platform, approach
side completed.
January 22, 2005
Last cable bundles on the west approach completed.
22th cables built on the east channel extension.
January 30, 2005
Last shark fin edge girders added to the east
channel platform. But it was foggy as you can tell - so not a lot of detail.
4pm
4pm
4pm
February 5, 2005
The channel side stay pipes and cables erected
(316) and sand blasting of the pylon faces continues.

February 12, 2005
Big Week!! Freyssinet completed the last stay
cable (416) while sand blasting of the pylon faces continues.
Visit pulling the last strand with Freyssinet
.

February 20, 2005
Another Big Week!! PBS erected the north and
south center edge girders.

February 27, 2705
A rather dark, dim and gloomy morning.

March 6, 2705
A rather wonderful and warm sun this morning.

March 13, 2705
Look - the west crane is growing down.
1pm
1pm
1pm
March 19, 2005
Look - the west crane is still growing down.

March 26, 2005
Look dad - the west crane is gone.

April 2, 2005
April 8, 2005
April 9, 2005
Very nice evening sun and the east tower crane
continues to grow down
April 14, 2005
Nice evening sun and the east tower crane is gone
except for a jib segment resting on the deck and a sleeping barge below.
April 15, 2005
No west crane, no east crane, no barge, only
bridge(s)
April 16, 2005
No west crane, no east crane, no barge, just
early morning light and bridges.
April 23, 2005
There were many clouds today which made interesting
light effects. Note how the light plays with the western side of the stay
pipes in the images below.
A surprise, from the Sea Breeze Marina
May 14, 2005
Another look at our new bridge from the S.C.
Aquarium. If your curious eyes are activated and you use your imagination
you can see the white fence along the bicycle lane to the right of
the east pylon. (This requires vivid imagination).

May 27, 2005
Its all over except the finish work. The paving
of the main and back spans is complete. Only those with hyper-curious eyes
can see the changes.

The gapless center span
June 4, 2005
Mostly rain this week - but moment of sunshine just now
The main span
The back spans and gapless center span
June 11, 2005:
From the pier at the IMAX theater

From the bicycle lane

June 12, 2005:
From the IMAX pier also
Views of the Ravenel Bridge and a surprise video
There were many clouds such that the sunlight created interesting patterns of light on the pylons and cables. Enable your curious eyes and explore the images below
From the pier at the IMAX theater

a day later - the main span
From the bicycle lane

From the Motley-Rice Building: our new bridge with birds

While watching the changing patterns of light on the cable-stay pipe, a cargo ship appeared. I thought it would be fun to capture the changning light patterns while the ship was passing. I took photos about 1 every 10 seconds and then converted them to an mpeg video using the ImageMagic tool, convert. As you can see, the images bound around a bit, but I thought it was an interesting way to bring a bit of life to our new bridge.
Click for a video ( 300x200 2.5 Mb) of the Sealand Cargo Ship passing under the bridgeor [ click for large (600x400) video (7 Mb)]

From the Yorktown
From just north of the bridge
June 19, 2005
The weather has been crazy - with unpredictable periods of clouds and rain.
The good news is that
the patterns of light on our new bridge and reflections from the stay-cable
pipes has been very interesting.
From the IMAX Theater

From Mt. Pleasant
From the Yorktown
June 26, 2005: From Easton Pennsylvania
Our son-in-law, daughter and grandson moved from Allentown to Easton and so this weekend, we are in Easton to help. My weekly data collection visits to the new Cooper River Bridge asked why not find a bridge here? So this morning I started walking down the long hill from Trevor and Rachel's new home, above the Deleware river. Sure enough, there was a bridge. I even managed to walk from Pennsylvania to New Jersey and back while taking a few photos. Here are two of the bridges.From a distance
A box girder bridge
and a small suspension bridge
and a digital sketch
The Internet both flattens and minifies our world. Today (July 19, 2005) Joe Reilly from Easton sent me a short story of the suspension bridge (called the Free Bridge):
My family and I vacation on Kiawah Island and we always visit Charleston at least once during our stay. I have been following with interest the construction of the Cooper River Bridge. (I am a mechanical draftsman and love anything to do with big construction.)Imagine my shock when looking at the bottom of Home page and seeing pictures of what the locals here call the "Free bridge" (suspension) and what the locals call the "toll bridge" (box girder). I grew up across the river from Easton. (Phillipsburg NJ.)
I've attached pictures of the bridges taken last Sept. when hurricane Irene swept thru. The river had not been out of it's banks in 50 years and in a matter of 7 months flooded twice. (again this past march)
July 17, 2005: The first day of traffic
Finished: SCDOT and PBC brought us
something to be extremely proud of. And of course, all the white
stay cable pipes were installed by my Freyssinet friends.


July 17, 2005: Another Aerial Adventure
This time, with Vince Streano as my teacher, we made another pass above and around the bridge - this time with traffic flowing between Charleston and Mt. Pleasant.



My results need a bit of improvement - but they are getting better. The real problem that I must master is converting proprietary Nikon NEF format to a standard format that I can manipulate - within the open source frame of reference (GNU-Linux). I've been using dcraw with some success - but I need a bit more work.

July 24, 2005: No weekend is complete without a photo of a bridge - this time, crossing the Seine

August 1, 2005: Paris
An opportunity to walk along the Seine and capture some of the early morning reflections of bridges and stuff. In this case, the Statue of Liberty, with a bridge in the background. From the building on the left, you can see the time: 7:02 am.